Yard work in Miriamburg

tokeri51's picture

No votes yet

While my wife concentrates in adding roads and details to the lower part of the layout in Karolville, I started laying track for the main yard in Miriamburg.  This yard will have 4 storage tracks a long yard lead that also serves a couple of industries, a caboose track, and an engine service facility. For now, due to lack of revenue the TT will not be installed and it will be just a couple of tracks leading away from yard. You can see the layout plan in my gallery.

So far I have placed the Arrivall/departure track and 2 of the storage tracks.  Need to adquire a few more turnouts and some straight track this weekend. Hope to finish it (without the TT) by Labor Day. Will post some pictures right after!

 


Powered by Drupal - Modified by Todd Vaules