Layout Design and Planning
Code 55 Basic Plans.
need help with new plan


So this is my new room sized layout..... plan is not completed 100% yet. Obviously because I have two tracks that go nowhere.
So the north eastern section needs a rebuild. but I wanna keep this:
general idea of a sceniced area alive.
Kato as McDonalds

My fellow N-scaler's, your advice please -
We have probably all seen the McDonald's train-type toys which consist of 4 squares shaped like pieces of a jigsaw, which can be locked together in a variety of ways and on which are engraved a 'railway track' on which a clockwork toy trundles round and round and round.
My wife has suggested that it would be possible to duplicate this sort of 'layout' using four pieces of curved Kato Unitrack (probably of 8.5" radii), each attached to its own peice of ply.
Location(s)
About print from RTS8

Hi everyone.
I would like to know if is posible print the RTS plans 1:1, in a blue print machine (not sure if you call that plot it)...if is possible what kind of archive I have to use? (bitmap, windows-metafile, autoCAD-DXF)
Thanks all and sorry about my english.
Regards Gus.
Operations and design
I have posted two version of my layout. Can you please comment if the second one is better for operation?
[G2:53352]
This is the current layout as it is being built.
[G2:53855]
This is the modification.
Does it make it more logical to connect the industries to the yard instead of to the main line.
Thanks for your suggestions
Tomas Keri
WHERE DO I START?

Well guys this is my first ever post to anything. After spending the last month reading the forums, I have come away with more questions than answers.
Location(s)
UP-BNSF Meet at Rosenberg in N-scale

Hi Guys
I have posted my layout for your comments. Kindly give me your comments either in here or in my blog- http://rosenberg-meet.blogspot.com
Thks
Jimmy Low
new track plan in the works...new room to build in!

So I'll be moving to a new place by Christmas it looks like... so I've pretty much stopped pouring money into the current layout. I still plan on ballasting and doing a few scenic things to practice, but buildings and track will be on hold as I save for the new layout.
Anyways, instead of getting a small corner of the house in the hallway i'll be getting a full on spare room. About 9m square... I haven't done the conversion to imperial yet...
The Umpqua Western is well underway!!

On Friday 7/25/08 the golden spike celebration was held and the owner feasted. There are no shorts or sneak shorts on the main and DCC is tied into the main now. Time soon to build the add-on tail of the "L" so that the engine facility can be built. The spurs will be added soon and industry can be added. SOON the Umpqua Western will be hauling revenue freight.
Jacko
