View RSS Feed

Recent Blogs Posts

  1. MBTA - Keolis Welded Rail Train at Belmont Massachusetts 6/9/2020

  2. Sooo...Anything new in the last six years?

    Hi Everyone!

    I guess I'd better do an update if this is going to make any sense at all. My last posts dealt with two things, my layout and my cable access TV show. I did 18 episodes of the show and then summer came, and my involvement with the Cape Cod Baseball League took center stage. For the second season of "Mini-Rails" I had eight or ten people lined up to visit and tour their layouts when our family life took at hit. Fallout included the sale of a piece of rental ...

    Updated 14th Jun 2020 at 10:39 AM by Albey25

    Categories
    'N' Scale Related
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	Scituate-Lighthouse[1] (2).jpg 
Views:	11 
Size:	80.3 KB 
ID:	111352   Click image for larger version. 

Name:	Early terrain lighthouse (2).jpg 
Views:	11 
Size:	131.9 KB 
ID:	111353   Click image for larger version. 

Name:	20200430_141928 (2).jpg 
Views:	9 
Size:	141.8 KB 
ID:	111354   Click image for larger version. 

Name:	Ocean getting close (2).jpg 
Views:	9 
Size:	144.0 KB 
ID:	111388   Click image for larger version. 

Name:	Lighthouse capped.jpg 
Views:	12 
Size:	150.4 KB 
ID:	111509  
  3. Memorial in Corona times

    Good afternoon , even in Corona times our King pays honor to those buried at Margraten Cemetery. For those who don't know it ( I tell about it every year , it's my way of thanking ) 8301 American soldiers lay buried here and there are 2 walls with the names of another 1722 who's bodies were never found. The graves are maintained by the American Battle Monuments Commission , the grounds have been lent to the USA for eternity as a token of honor and gratitude from The Netherlands . The graves ...
  4. Equipment Frustrations

    After a full two weeks, I have cancelled my original order for equipment from Tony's Train XChange. The cancellation policy unambiguously states "[o]rder cancellation requests must be submitted ... within 24 hours", which I have exceeded by at least 300 hours. Most of what I ordered was out of stock with an expected restocking time of 10 days, but I think it likely that the supply chain has been disrupted by the Wuhan virus.

    I will not be receiving:
    • Kato N 106-6273
    ...
  5. Starting Equipment Purchased

    Additional Equipment Purchased:
    • Kato N 106-6273 EMD F7 Freight Train Set, Std. DC, ATSF Bluebonnet
    • Digitrax DN163K0B Decoder
    • Digitrax DTXZEPE Zephyr Express Starter Set DCS52
    • 2 x Atlas #2092 N Scale Code 55 Terminal Joiners
    • 10 x N CODE 55 SUPERFLEX TRACK 30" LONG
    • ATLAS MODEL 2091 Code 55 Insulated Rail Joiner (24) N
    • 2 x N Code 55 Nickel Silver Metal Rail Joiner (24pcs) Atlas Trains by Atlas
    • 50 x Midwest Products 3019 Railroad Cork N Cork Roadbed
    • Printer Cable USB 2.0
    • Kapton
    ...

    Updated 19th Apr 2020 at 12:28 PM by Richard

    Categories
    Uncategorized
Page 1 of 146 123451151101 ... LastLast