Hmm, I have given this a great deal of thought and consideration, proving beyond all doubt that all responses will be well thought out, and can only conclude
wombat457 Today, 08:48 PMThese days it would be a PTC transmitter tower and one of those omnipresent aluminum sheds. https://trn.trains.com/railroads/abc...-train-control
NtheBasement Today, 08:23 PMFinally sold horse, so now there is room in the stable for visiting moose.
el Gato Gordo Today, 08:21 PMI got the first 4 signals installed on my layout and working with the TrainController software.
Question: I’m not a railroader by trade
From Sat Dec 21st 2019 to 22nd Dec 2019
On Sun Jan 12th 2020
On Sun Feb 9th 2020
On Sat Mar 21st 2020
From Fri May 15th 2020 to 17th May 2020
All Logos and Trademarks on this Site are property of their respective Owners.
Member content is the property of the poster.
All the rest © 2003- by nScale.net.
Site sponsored by Gargoyle.
Weekend Update (13th Dec 2019)
First, you need a signal bungalow. Holds the batteries, relays, signal logic controllers, communication equipment, etc. And there would be switch machines
Paul Schmidt Today, 08:51 PM