    This Thursday as part of my job I visited the construction site of the Fehmarnbelt Fixed Link, which - when completed - will be the world's longest immersed road and rail tunnel, linking Denmark and Germany. Currently under construction is the factory for the tunnel elements and the associated work harbour, and the scale of the construction site alone simply blows my mind.

    The company building the tunnel is Femern A/S, which is a subsidiary of Sund & Bælt Holding, which is also the parent company for Storebælt A/S, which owns and operates the Storebælt Fixed Link where I work and which includes two bridges and a tunnel.

    While I'm in operations of the sister company and thus not directly involved in the construction of the tunnel, we are indeed working with the design and construction teams to incorporate the lessons learned from years of operation and maintenance on the Storebælt link. A minor tweak of the design now can make life easier (and operations cheaper) decades down the line, for example by making sure that there are easy ways to replace large drain pumps, high voltage transformers and other items and systems that have shorter life spans than the tunnel itself.

    A Youtube construction channel recently made a great video about the project, but what the video does not really mention is the connecting infrastructure works in Denmark, including the new high speed line out of Copenhagen and electrification and upgrading the rest of the line to Fehmarn to 200 km/h line speed. Part of the upgrade is a new bridge across the Storstrøm strait, replacing the ageing 3.5 km single-track bridge from 1937.

    YouTube: http://www.youtube.com/user/SteamPower4ever

    Failure is always an option.
    - Adam Savage


  2. #2
    Join Date
    Apr 2022
    Location
    Missouri
    Posts
    485
    Thanks
    330
    Thanked 1,012 Times in 331 Posts
    Mentioned
    29 Post(s)
    Tagged
    0 Thread(s)

    Default

    Very interesting to say the least. The Channel Tunnel was still under construction when I was stationed in Germany. The Channel Tunnel opened up in 1994 but I never got the chance to travel through it. I left Germany in Dec 94 but spent most of that year in the field training for the Bosnia peace keeping mission.
    Just an old gandy dancer.


  3. The Following 3 Users Say Thank You to Army-Gandydancer For This Useful Post:


  4. #3
    Join Date
    Feb 2013
    Location
    Colorado Springs, CO, US of A
    Posts
    4,689
    Blog Entries
    1
    Thanks
    16,473
    Thanked 11,163 Times in 3,243 Posts
    Mentioned
    200 Post(s)
    Tagged
    0 Thread(s)

    Default

    That is fantastic! I worked on the 2nd Hampton Roads Bridge-Tunnel in 1976. It was built in sections, barged out to location and sunk into place. Sections were joined underwater as they were built. Rapid tidal flow through there complicated placement. I worked on mainline wiring to get power to the ventilator buildings.

    That was only a two lane highway, since it was a 2nd parallel unit. I can only imagine how the difficulties expand exponentially on this new tunnel!

  5. The Following 3 Users Say Thank You to el Gato Gordo For This Useful Post:


  6. #4
    Join Date
    Apr 2022
    Location
    Missouri
    Posts
    485
    Thanks
    330
    Thanked 1,012 Times in 331 Posts
    Mentioned
    29 Post(s)
    Tagged
    0 Thread(s)

    Default

    I'm sure it is difficult to place tunnel sections, especially with strong currents. I worked a little on one of the Lock and Damns on the Mississippi River back in 1989. That was bad enough trying to get concrete forms set just right with the river's current.
    Just an old gandy dancer.


  7. The Following 2 Users Say Thank You to Army-Gandydancer For This Useful Post:


  8. #5
    Join Date
    May 2014
    Posts
    1,544
    Blog Entries
    1
    Thanks
    5,396
    Thanked 7,692 Times in 1,170 Posts
    Mentioned
    60 Post(s)
    Tagged
    0 Thread(s)

    Default

    Fortunately there are no strong currents at the entrance to the Baltic Sea where the tunnel is being built, but the ground below varies significantly from very hard (almost as concrete) at the Danish coast to fairly soft at the German coast. But that is of course being dealt with by the construction teams.

    The tunnel is currently scheduled to open for traffic in 2029, which - give or take a few years - is when I retire, so along the way I'll be surprised if I'm not dragged into the project more than I am now
    YouTube: http://www.youtube.com/user/SteamPower4ever

    Failure is always an option.
    - Adam Savage

  9. The Following 2 Users Say Thank You to SteamPower4ever For This Useful Post:


  10. #6
    Join Date
    Apr 2014
    Location
    southeast michigan
    Posts
    2,066
    Thanks
    1,705
    Thanked 4,117 Times in 1,223 Posts
    Mentioned
    103 Post(s)
    Tagged
    0 Thread(s)

    Default

    Sound cool except for the 100 euro toll. How much is the Chunnel toll?
    Moving coal the old way: https://youtu.be/RWJVt4r_pgc
    Moving coal the new way: https://youtu.be/sN25ncLMI8k

  11. #7
    Join Date
    Sep 2014
    Location
    Alberta
    Posts
    1,638
    Thanks
    5,742
    Thanked 1,920 Times in 971 Posts
    Mentioned
    57 Post(s)
    Tagged
    0 Thread(s)

  12. The Following User Says Thank You to Scotian_Huntress For This Useful Post:


  13. #8
    Join Date
    May 2014
    Posts
    1,544
    Blog Entries
    1
    Thanks
    5,396
    Thanked 7,692 Times in 1,170 Posts
    Mentioned
    60 Post(s)
    Tagged
    0 Thread(s)

    Default

    Quote Originally Posted by NtheBasement View Post
    Sound cool except for the 100 euro toll.
    It's pretty much the same price as the ferry today.
    YouTube: http://www.youtube.com/user/SteamPower4ever

    Failure is always an option.
    - Adam Savage

  14. The Following User Says Thank You to SteamPower4ever For This Useful Post:


  15. #9
    Join Date
    Feb 2013
    Location
    Colorado Springs, CO, US of A
    Posts
    4,689
    Blog Entries
    1
    Thanks
    16,473
    Thanked 11,163 Times in 3,243 Posts
    Mentioned
    200 Post(s)
    Tagged
    0 Thread(s)

    Default

    I didn't catch how long the tunnel will be. I wonder how they will ventilate the automobile exhaust gasses?

  16. #10
    Join Date
    Feb 2012
    Location
    NJ, near old Lehigh Valley RR
    Posts
    3,185
    Blog Entries
    7
    Thanks
    12,817
    Thanked 4,321 Times in 1,670 Posts
    Mentioned
    79 Post(s)
    Tagged
    0 Thread(s)

    Default

    It is hard to imagine the engineering that has to go into these massive projects. Even one aspect, ventilation, must be an enormous task.
    The Hvalfjörður Tunnel in Iceland is only 5,770 meters /18,930 ft long, not an immersion tunnel, but has been criticized for poor ventilation and lighting. I believe I read it was done very cost effectively and paid its cost to build off in something like 10 years. (don't quote me) But may account for some of the safety issues around it.
    Steve - Jugtown Modeler - Don't know enough about railroading yet, but scale modeling is my life - Web-Folio
    Blog: American Revolutionary War Diorama:https://www.nscale.net/forums/entry....onment-Diorama
    The introduction of so powerful an agent as steam to a carriage on wheels will make a great change in the situation of man. — Thomas Jefferson

  17. #11
    Join Date
    Jan 2012
    Posts
    2,018
    Thanks
    5,629
    Thanked 4,597 Times in 1,333 Posts
    Mentioned
    137 Post(s)
    Tagged
    0 Thread(s)

    Default

    Quote Originally Posted by el Gato Gordo View Post
    I didn't catch how long the tunnel will be. I wonder how they will ventilate the automobile exhaust gasses?
    It's going to be 18km / 11 miles: https://en.wikipedia.org/wiki/Fehmarn_Belt_fixed_link

    Ventilation is an issue. One of the more complex ones, along with firefighting and evacuation concepts, for sure.

    A friend of mine - volunteering for the German civil protection agency THW - was posted to a much shorter, 1.6km / 1 mile tunnel a couple of years ago to supervise the emergency generators. Basically all he did was sit there, watch the generators to make sure they were ready to start in case of a power loss and complain about bad cellular data coverage in the area but that kind of tells you how important uninterrupted ventilation is for that kind of tunnels.

    Heiko

  18. The Following 2 Users Say Thank You to Heiko For This Useful Post:


Similar Threads

  1. World record longest narrow gauge passenger train
    By el Gato Gordo in forum General Rail Discussion
    Replies: 4
    Last Post: 31st Oct 2022, 07:59 AM
  2. World's Steepest Rail Line
    By DrifterNL in forum General Rail Discussion
    Replies: 3
    Last Post: 12th Dec 2020, 04:53 PM
  3. Real High Speed Rail Coming to USA? Our own Shinkansen?
    By bicknell in forum General Research
    Replies: 1
    Last Post: 31st Oct 2019, 09:30 AM
  4. Coming in 2nd Place on Ebay - Need your feedback
    By Mac in forum General Rail Discussion
    Replies: 73
    Last Post: 21st Feb 2017, 04:06 PM
  5. YouTube -> Longest train officially in the world
    By DrifterNL in forum General Rail Discussion
    Replies: 0
    Last Post: 13th Sep 2009, 03:50 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •